Automated glass bottle production at HangoTech

OEM / ODM services

Custom glass, from brief
to bulk production.

Develop glassware and packaging with a 40,000 m² factory, eight production machines and project-specific support from brief to export packing.

Six-step process

A clear handoff
at every stage.

Send a drawing, sample or reference image with your target quantity and destination. Feasibility, tooling, samples and production timing are confirmed before commitment.

  1. 01

    Requirement & drawing review

    Confirm intended use, capacity, dimensions, quantity, destination and reference files.

  2. 02

    Feasibility & sample plan

    Review existing molds or new tooling, decoration, accessories, estimated cost and sample route.

  3. 03

    Quotation & order confirmation

    Agree the commercial scope, specifications, timeline, payment terms and responsibilities in writing.

  4. 04

    Sample & approval

    Evaluate the sample, artwork, color, function and packing direction before bulk production.

  5. 05

    Production & in-process checks

    Manufacture against the approved references and perform agreed checks at critical stages.

  6. 06

    Final inspection & delivery

    Verify finished goods, quantities, packing and shipment documents before handoff.

Project configuration

Define what the product
needs before production.

OEM and ODM planning turns the buyer's idea into four connected specifications. Each choice is reviewed for technical feasibility, order quantity and compatibility before samples or bulk production proceed.

01

Shape & mold route

Match the brief to an existing model or assess new tooling when the required form cannot be achieved from the current catalogue.

02

Color & decoration

Confirm glass color, coating, printing, frosting, artwork position and the approval reference for the selected finish.

03

Closure & accessories

Review neck finish, pumps, caps, sprayers, reeds and other components against the product application and filling method.

04

Packing & export plan

Define dividers, inner boxes, carton marks, pallet requirements and shipping preparation around the approved product.

Model routeExisting mold or new-tooling assessment
Approval referenceDrawing, sample, artwork and written specification
Production routeProcess and inspection points selected for the product
Delivery preparationFinal packing, marks, documents and shipment handoff

Two development routes

Use an existing model
or develop a new mold.

Existing products can often be adapted through decoration, glass color, closures, accessories and packing. A new mold is considered when the required shape, dimensions or functional details cannot be achieved with an existing model.

Stock orders typically require 15-20 days. Custom orders typically require 30-60 days, depending on tooling, samples, decoration, quantity and packing. The applicable schedule is confirmed in the quotation.

Explore custom services →
HangoTech I.S. machine workshop for glass container production
I.S. machine workshop used in glass-container production.
Close-up of glass containers at the forming machine

Production review

Confirm the details that
affect forming and handling.

Shape, wall distribution, neck finish, dimensional limits and downstream handling requirements are reviewed as part of the selected development route. The final standard is established through drawings, samples and written approval.

See quality control →

Start developing

Share your product idea.

Include dimensions, capacity, finish, closure, quantity and target delivery date where available.

Send an RFQ
Top